Application Status

January 2026

Accepted
An application that meets the basic requirements (as stipulated in the application form / with all the necessary documents) is logged on the system.
Granted
An application that has been evaluated by an Analyst and a recommendation made, signed by the "Controller". At this point an approval letter is generated by the system in notification of approval of license to the applicant and request for payment of licence fees is indicated.
Issued
A licence certificate is issued to the applicant, either by walk-in collection or sent via registered mail, after receiving proof of payment from the Applicant. (NEDBANK - Bank deposit slip with correct licence fee and quoting the reference number as indicated on the APPROVAL LETTER).
Refused
An application that has been evaluated by an Analyst and a recommendation made, signed by the "Controller". At this point a refusal letter has already been drafted and signed by the "Controller" in notification of refusal of license application and stating reasons for refusal.

December 2025

Accepted
An application that meets the basic requirements (as stipulated in the application form / with all the necessary documents) is logged on the system.
Granted
An application that has been evaluated by an Analyst and a recommendation made, signed by the "Controller". An approval letter is generated requesting payment of licence fees.
Issued
Licence certificate issued after receiving proof of payment (NEDBANK deposit slip with correct reference).
Refused
Refusal letter issued by the "Controller" stating reasons for refusal.

November 2025

Accepted
Application meeting all required documentation is logged on the system.
Granted
Application evaluated and approval letter generated.
Issued
Licence certificate issued after payment confirmation.
Refused
Refusal notice issued outlining reasons.

October 2025

Accepted
An application that meets the basic requirements (as stipulated in the application form / with all the necessary documents) is logged on the system.
Granted
Application evaluated by Analyst and signed by the "Controller". Approval letter generated requesting payment.
Issued
Licence certificate issued after proof of payment is received.
Refused
Refusal letter issued by the "Controller" outlining reasons.

September 2025

Accepted
Application meeting all required documentation is logged on the system.
Granted
Application evaluated and approval letter generated.
Issued
Licence certificate issued after payment confirmation.
Refused
Refusal notice issued outlining reasons.

August 2025

Accepted
Application meeting required documentation logged on system.
Granted
Approval letter generated requesting payment.
Issued
Licence certificate issued upon proof of payment.
Refused
Refusal letter issued outlining reasons.

July 2025

Accepted
An application that meets the basic requirements (with all necessary documents) is logged on the system.
Granted
Application evaluated and signed by the "Controller". Approval letter generated requesting payment.
Issued
Licence certificate issued after proof of payment is received.
Refused
Refusal letter issued stating reasons for refusal.

June 2025

Accepted
Application meeting required documentation logged on the system.
Granted
Approval letter generated and signed by the "Controller".
Issued
Licence certificate issued upon payment confirmation.
Refused
Refusal notice issued outlining reasons.

May 2025

Accepted
Application logged on system after meeting documentation requirements.
Granted
Application evaluated and approval letter generated.
Issued
Licence certificate issued after payment confirmation.
Refused
Refusal letter issued stating reasons.

April 2025

Accepted
Application meeting documentation requirements logged on system.
Granted
Approval letter generated by the system.
Issued
Licence certificate issued after payment.
Refused
Refusal notice issued outlining reasons.

March 2025

Accepted
An application that meets the basic requirements (as stipulated in the application form / with all the necessary documents) is logged on the system.
Granted
An application that has been evaluated by an Analyst and a recommendation made, signed by the "Controller". An approval letter is generated by the system requesting payment of licence fees.
Issued
A licence certificate is issued to the applicant after receiving proof of payment (NEDBANK deposit slip with correct reference number as indicated on the approval letter).
Refused
A refusal letter, signed by the "Controller", is issued to the applicant stating the reasons for refusal of the licence application.

February 2025

Accepted
An application that meets the basic requirements (as stipulated in the application form / with all the necessary documents) is logged on the system.
Granted
An application that has been evaluated by an Analyst and a recommendation made, signed by the "Controller". An approval letter is generated by the system requesting payment of licence fees.
Issued
A licence certificate is issued to the applicant after receiving proof of payment (NEDBANK deposit slip with correct reference number as indicated on the approval letter).
Refused
A refusal letter, signed by the "Controller", is issued to the applicant stating the reasons for refusal of the licence application.

January 2025

Accepted
Application meeting required documentation logged on system.
Granted
Approval letter generated and signed by the "Controller".
Issued
Licence certificate issued upon payment confirmation.
Refused
Refusal letter issued stating reasons for refusal.

December 2024

Accepted
An application that meets the basic requirements (as stipulated in the application form / with all the necessary documents) is logged on the system.
Granted
An application that has been evaluated by an Analyst and a recommendation made, signed by the "Controller". An approval letter is generated requesting payment of licence fees.
Issued
Licence certificate issued after receiving proof of payment (NEDBANK deposit slip with correct reference).
Refused
Refusal letter issued by the "Controller" stating reasons for refusal.

November 2024

Accepted
Application meeting all required documentation is logged on the system.
Granted
Application evaluated and approval letter generated.
Issued
Licence certificate issued after payment confirmation.
Refused
Refusal notice issued outlining reasons.

October 2024

Accepted
An application that meets the basic requirements (as stipulated in the application form / with all the necessary documents) is logged on the system.
Granted
Application evaluated by Analyst and signed by the "Controller". Approval letter generated requesting payment.
Issued
Licence certificate issued after proof of payment is received.
Refused
Refusal letter issued by the "Controller" outlining reasons.

September 2024

Accepted
Application meeting all required documentation is logged on the system.
Granted
Application evaluated and approval letter generated.
Issued
Licence certificate issued after payment confirmation.
Refused
Refusal notice issued outlining reasons.

August 2024

Accepted
Application meeting required documentation logged on system.
Granted
Approval letter generated requesting payment.
Issued
Licence certificate issued upon proof of payment.
Refused
Refusal letter issued outlining reasons.

July 2024

Accepted
An application that meets the basic requirements (with all necessary documents) is logged on the system.
Granted
Application evaluated and signed by the "Controller". Approval letter generated requesting payment.
Issued
Licence certificate issued after proof of payment is received.
Refused
Refusal letter issued stating reasons for refusal.

June 2024

Accepted
Application meeting required documentation logged on the system.
Granted
Approval letter generated and signed by the "Controller".
Issued
Licence certificate issued upon payment confirmation.
Refused
Refusal notice issued outlining reasons.

May 2024

Accepted
Application logged on system after meeting documentation requirements.
Granted
Application evaluated and approval letter generated.
Issued
Licence certificate issued after payment confirmation.
Refused
Refusal letter issued stating reasons.

April 2024

Accepted
Application meeting documentation requirements logged on system.
Granted
Approval letter generated by the system.
Issued
Licence certificate issued after payment.
Refused
Refusal notice issued outlining reasons.

March 2024

Accepted
An application that meets the basic requirements (as stipulated in the application form / with all the necessary documents) is logged on the system.
Granted
An application that has been evaluated by an Analyst and a recommendation made, signed by the "Controller". An approval letter is generated by the system requesting payment of licence fees.
Issued
A licence certificate is issued to the applicant after receiving proof of payment (NEDBANK deposit slip with correct reference number as indicated on the approval letter).
Refused
A refusal letter, signed by the "Controller", is issued to the applicant stating the reasons for refusal of the licence application.

February 2024

Accepted
An application that meets the basic requirements (as stipulated in the application form / with all the necessary documents) is logged on the system.
Granted
An application that has been evaluated by an Analyst and a recommendation made, signed by the "Controller". An approval letter is generated by the system requesting payment of licence fees.
Issued
A licence certificate is issued to the applicant after receiving proof of payment (NEDBANK deposit slip with correct reference number as indicated on the approval letter).
Refused
A refusal letter, signed by the "Controller", is issued to the applicant stating the reasons for refusal of the licence application.

January 2024

Accepted
Application meeting required documentation logged on system.
Granted
Approval letter generated and signed by the "Controller".
Issued
Licence certificate issued upon payment confirmation.
Refused
Refusal letter issued stating reasons for refusal.

December 2023

Accepted
An application that meets the basic requirements (as stipulated in the application form / with all the necessary documents) is logged on the system.
Granted
An application that has been evaluated by an Analyst and a recommendation made, signed by the "Controller". An approval letter is generated requesting payment of licence fees.
Issued
Licence certificate issued after receiving proof of payment (NEDBANK deposit slip with correct reference).
Refused
Refusal letter issued by the "Controller" stating reasons for refusal.

November 2023

Accepted
Application meeting all required documentation is logged on the system.
Granted
Application evaluated and approval letter generated.
Issued
Licence certificate issued after payment confirmation.
Refused
Refusal notice issued outlining reasons.

October 2023

Accepted
An application that meets the basic requirements (as stipulated in the application form / with all the necessary documents) is logged on the system.
Granted
Application evaluated by Analyst and signed by the "Controller". Approval letter generated requesting payment.
Issued
Licence certificate issued after proof of payment is received.
Refused
Refusal letter issued by the "Controller" outlining reasons.

September 2023

Accepted
Application meeting all required documentation is logged on the system.
Granted
Application evaluated and approval letter generated.
Issued
Licence certificate issued after payment confirmation.
Refused
Refusal notice issued outlining reasons.

August 2023

Accepted
Application meeting required documentation logged on system.
Granted
Approval letter generated requesting payment.
Issued
Licence certificate issued upon proof of payment.
Refused
Refusal letter issued outlining reasons.

July 2023

Accepted
An application that meets the basic requirements (with all necessary documents) is logged on the system.
Granted
Application evaluated and signed by the "Controller". Approval letter generated requesting payment.
Issued
Licence certificate issued after proof of payment is received.
Refused
Refusal letter issued stating reasons for refusal.

June 2023

Accepted
Application meeting required documentation logged on the system.
Granted
Approval letter generated and signed by the "Controller".
Issued
Licence certificate issued upon payment confirmation.
Refused
Refusal notice issued outlining reasons.

May 2023

Accepted
Application logged on system after meeting documentation requirements.
Granted
Application evaluated and approval letter generated.
Issued
Licence certificate issued after payment confirmation.
Refused
Refusal letter issued stating reasons.

April 2023

Accepted
Application meeting documentation requirements logged on system.
Granted
Approval letter generated by the system.
Issued
Licence certificate issued after payment.
Refused
Refusal notice issued outlining reasons.

March 2023

Accepted
An application that meets the basic requirements (as stipulated in the application form / with all the necessary documents) is logged on the system.
Granted
An application that has been evaluated by an Analyst and a recommendation made, signed by the "Controller". An approval letter is generated by the system requesting payment of licence fees.
Issued
A licence certificate is issued to the applicant after receiving proof of payment (NEDBANK deposit slip with correct reference number as indicated on the approval letter).
Refused
A refusal letter, signed by the "Controller", is issued to the applicant stating the reasons for refusal of the licence application.

February 2023

Accepted
An application that meets the basic requirements (as stipulated in the application form / with all the necessary documents) is logged on the system.
Granted
An application that has been evaluated by an Analyst and a recommendation made, signed by the "Controller". An approval letter is generated by the system requesting payment of licence fees.
Issued
A licence certificate is issued to the applicant after receiving proof of payment (NEDBANK deposit slip with correct reference number as indicated on the approval letter).
Refused
A refusal letter, signed by the "Controller", is issued to the applicant stating the reasons for refusal of the licence application.

January 2023

Accepted
Application meeting required documentation logged on system.
Granted
Approval letter generated and signed by the "Controller".
Issued
Licence certificate issued upon payment confirmation.
Refused
Refusal letter issued stating reasons for refusal.

December 2024

Accepted
An application that meets the basic requirements (as stipulated in the application form / with all the necessary documents) is logged on the system.
Granted
An application that has been evaluated by an Analyst and a recommendation made, signed by the "Controller". An approval letter is generated requesting payment of licence fees.
Issued
Licence certificate issued after receiving proof of payment (NEDBANK deposit slip with correct reference).
Refused
Refusal letter issued by the "Controller" stating reasons for refusal.

November 2024

Accepted
Application meeting all required documentation is logged on the system.
Granted
Application evaluated and approval letter generated.
Issued
Licence certificate issued after payment confirmation.
Refused
Refusal notice issued outlining reasons.

October 2024

Accepted
An application that meets the basic requirements (as stipulated in the application form / with all the necessary documents) is logged on the system.
Granted
Application evaluated by Analyst and signed by the "Controller". Approval letter generated requesting payment.
Issued
Licence certificate issued after proof of payment is received.
Refused
Refusal letter issued by the "Controller" outlining reasons.

September 2024

Accepted
Application meeting all required documentation is logged on the system.
Granted
Application evaluated and approval letter generated.
Issued
Licence certificate issued after payment confirmation.
Refused
Refusal notice issued outlining reasons.

August 2024

Accepted
Application meeting required documentation logged on system.
Granted
Approval letter generated requesting payment.
Issued
Licence certificate issued upon proof of payment.
Refused
Refusal letter issued outlining reasons.

July 2024

Accepted
An application that meets the basic requirements (with all necessary documents) is logged on the system.
Granted
Application evaluated and signed by the "Controller". Approval letter generated requesting payment.
Issued
Licence certificate issued after proof of payment is received.
Refused
Refusal letter issued stating reasons for refusal.

June 2024

Accepted
Application meeting required documentation logged on the system.
Granted
Approval letter generated and signed by the "Controller".
Issued
Licence certificate issued upon payment confirmation.
Refused
Refusal notice issued outlining reasons.

May 2024

Accepted
Application logged on system after meeting documentation requirements.
Granted
Application evaluated and approval letter generated.
Issued
Licence certificate issued after payment confirmation.
Refused
Refusal letter issued stating reasons.

April 2024

Accepted
Application meeting documentation requirements logged on system.
Granted
Approval letter generated by the system.
Issued
Licence certificate issued after payment.
Refused
Refusal notice issued outlining reasons.

March 2024

Accepted
An application that meets the basic requirements (as stipulated in the application form / with all the necessary documents) is logged on the system.
Granted
An application that has been evaluated by an Analyst and a recommendation made, signed by the "Controller". An approval letter is generated by the system requesting payment of licence fees.
Issued
A licence certificate is issued to the applicant after receiving proof of payment (NEDBANK deposit slip with correct reference number as indicated on the approval letter).
Refused
A refusal letter, signed by the "Controller", is issued to the applicant stating the reasons for refusal of the licence application.

February 2024

Accepted
An application that meets the basic requirements (as stipulated in the application form / with all the necessary documents) is logged on the system.
Granted
An application that has been evaluated by an Analyst and a recommendation made, signed by the "Controller". An approval letter is generated by the system requesting payment of licence fees.
Issued
A licence certificate is issued to the applicant after receiving proof of payment (NEDBANK deposit slip with correct reference number as indicated on the approval letter).
Refused
A refusal letter, signed by the "Controller", is issued to the applicant stating the reasons for refusal of the licence application.

January 2024

Accepted
Application meeting required documentation logged on system.
Granted
Approval letter generated and signed by the "Controller".
Issued
Licence certificate issued upon payment confirmation.
Refused
Refusal letter issued stating reasons for refusal.

December 2022

Accepted
An application that meets the basic requirements (as stipulated in the application form / with all the necessary documents) is logged on the system.
Granted
An application that has been evaluated by an Analyst and a recommendation made, signed by the "Controller". An approval letter is generated requesting payment of licence fees.
Issued
Licence certificate issued after receiving proof of payment (NEDBANK deposit slip with correct reference).
Refused
Refusal letter issued by the "Controller" stating reasons for refusal.

November 2022

Accepted
Application meeting all required documentation is logged on the system.
Granted
Application evaluated and approval letter generated.
Issued
Licence certificate issued after payment confirmation.
Refused
Refusal notice issued outlining reasons.

October 2022

Accepted
An application that meets the basic requirements (as stipulated in the application form / with all the necessary documents) is logged on the system.
Granted
Application evaluated by Analyst and signed by the "Controller". Approval letter generated requesting payment.
Issued
Licence certificate issued after proof of payment is received.
Refused
Refusal letter issued by the "Controller" outlining reasons.

September 2022

Accepted
Application meeting all required documentation is logged on the system.
Granted
Application evaluated and approval letter generated.
Issued
Licence certificate issued after payment confirmation.
Refused
Refusal notice issued outlining reasons.

August 2022

Accepted
Application meeting required documentation logged on system.
Granted
Approval letter generated requesting payment.
Issued
Licence certificate issued upon proof of payment.
Refused
Refusal letter issued outlining reasons.

July 2022

Accepted
An application that meets the basic requirements (with all necessary documents) is logged on the system.
Granted
Application evaluated and signed by the "Controller". Approval letter generated requesting payment.
Issued
Licence certificate issued after proof of payment is received.
Refused
Refusal letter issued stating reasons for refusal.

June 2022

Accepted
Application meeting required documentation logged on the system.
Granted
Approval letter generated and signed by the "Controller".
Issued
Licence certificate issued upon payment confirmation.
Refused
Refusal notice issued outlining reasons.

May 2022

Accepted
Application logged on system after meeting documentation requirements.
Granted
Application evaluated and approval letter generated.
Issued
Licence certificate issued after payment confirmation.
Refused
Refusal letter issued stating reasons.

April 2022

Accepted
Application meeting documentation requirements logged on system.
Granted
Approval letter generated by the system.
Issued
Licence certificate issued after payment.
Refused
Refusal notice issued outlining reasons.

March 2022

Accepted
An application that meets the basic requirements (as stipulated in the application form / with all the necessary documents) is logged on the system.
Granted
An application that has been evaluated by an Analyst and a recommendation made, signed by the "Controller". An approval letter is generated by the system requesting payment of licence fees.
Issued
A licence certificate is issued to the applicant after receiving proof of payment (NEDBANK deposit slip with correct reference number as indicated on the approval letter).
Refused
A refusal letter, signed by the "Controller", is issued to the applicant stating the reasons for refusal of the licence application.

February 2022

Accepted
An application that meets the basic requirements (as stipulated in the application form / with all the necessary documents) is logged on the system.
Granted
An application that has been evaluated by an Analyst and a recommendation made, signed by the "Controller". An approval letter is generated by the system requesting payment of licence fees.
Issued
A licence certificate is issued to the applicant after receiving proof of payment (NEDBANK deposit slip with correct reference number as indicated on the approval letter).
Refused
A refusal letter, signed by the "Controller", is issued to the applicant stating the reasons for refusal of the licence application.

January 2022

Accepted
Application meeting required documentation logged on system.
Granted
Approval letter generated and signed by the "Controller".
Issued
Licence certificate issued upon payment confirmation.
Refused
Refusal letter issued stating reasons for refusal.

December 2024

Accepted
An application that meets the basic requirements (as stipulated in the application form / with all the necessary documents) is logged on the system.
Granted
An application that has been evaluated by an Analyst and a recommendation made, signed by the "Controller". An approval letter is generated requesting payment of licence fees.
Issued
Licence certificate issued after receiving proof of payment (NEDBANK deposit slip with correct reference).
Refused
Refusal letter issued by the "Controller" stating reasons for refusal.

November 2024

Accepted
Application meeting all required documentation is logged on the system.
Granted
Application evaluated and approval letter generated.
Issued
Licence certificate issued after payment confirmation.
Refused
Refusal notice issued outlining reasons.

October 2024

Accepted
An application that meets the basic requirements (as stipulated in the application form / with all the necessary documents) is logged on the system.
Granted
Application evaluated by Analyst and signed by the "Controller". Approval letter generated requesting payment.
Issued
Licence certificate issued after proof of payment is received.
Refused
Refusal letter issued by the "Controller" outlining reasons.

September 2024

Accepted
Application meeting all required documentation is logged on the system.
Granted
Application evaluated and approval letter generated.
Issued
Licence certificate issued after payment confirmation.
Refused
Refusal notice issued outlining reasons.

August 2024

Accepted
Application meeting required documentation logged on system.
Granted
Approval letter generated requesting payment.
Issued
Licence certificate issued upon proof of payment.
Refused
Refusal letter issued outlining reasons.

July 2024

Accepted
An application that meets the basic requirements (with all necessary documents) is logged on the system.
Granted
Application evaluated and signed by the "Controller". Approval letter generated requesting payment.
Issued
Licence certificate issued after proof of payment is received.
Refused
Refusal letter issued stating reasons for refusal.

June 2024

Accepted
Application meeting required documentation logged on the system.
Granted
Approval letter generated and signed by the "Controller".
Issued
Licence certificate issued upon payment confirmation.
Refused
Refusal notice issued outlining reasons.

May 2024

Accepted
Application logged on system after meeting documentation requirements.
Granted
Application evaluated and approval letter generated.
Issued
Licence certificate issued after payment confirmation.
Refused
Refusal letter issued stating reasons.

April 2024

Accepted
Application meeting documentation requirements logged on system.
Granted
Approval letter generated by the system.
Issued
Licence certificate issued after payment.
Refused
Refusal notice issued outlining reasons.

March 2024

Accepted
An application that meets the basic requirements (as stipulated in the application form / with all the necessary documents) is logged on the system.
Granted
An application that has been evaluated by an Analyst and a recommendation made, signed by the "Controller". An approval letter is generated by the system requesting payment of licence fees.
Issued
A licence certificate is issued to the applicant after receiving proof of payment (NEDBANK deposit slip with correct reference number as indicated on the approval letter).
Refused
A refusal letter, signed by the "Controller", is issued to the applicant stating the reasons for refusal of the licence application.

February 2024

Accepted
An application that meets the basic requirements (as stipulated in the application form / with all the necessary documents) is logged on the system.
Granted
An application that has been evaluated by an Analyst and a recommendation made, signed by the "Controller". An approval letter is generated by the system requesting payment of licence fees.
Issued
A licence certificate is issued to the applicant after receiving proof of payment (NEDBANK deposit slip with correct reference number as indicated on the approval letter).
Refused
A refusal letter, signed by the "Controller", is issued to the applicant stating the reasons for refusal of the licence application.

January 2024

Accepted
Application meeting required documentation logged on system.
Granted
Approval letter generated and signed by the "Controller".
Issued
Licence certificate issued upon payment confirmation.
Refused
Refusal letter issued stating reasons for refusal.

December 2021

Accepted
An application that meets the basic requirements (as stipulated in the application form / with all the necessary documents) is logged on the system.
Granted
An application that has been evaluated by an Analyst and a recommendation made, signed by the "Controller". An approval letter is generated requesting payment of licence fees.
Issued
Licence certificate issued after receiving proof of payment (NEDBANK deposit slip with correct reference).
Refused
Refusal letter issued by the "Controller" stating reasons for refusal.

November 2021

Accepted
Application meeting all required documentation is logged on the system.
Granted
Application evaluated and approval letter generated.
Issued
Licence certificate issued after payment confirmation.
Refused
Refusal notice issued outlining reasons.

October 2021

Accepted
An application that meets the basic requirements (as stipulated in the application form / with all the necessary documents) is logged on the system.
Granted
Application evaluated by Analyst and signed by the "Controller". Approval letter generated requesting payment.
Issued
Licence certificate issued after proof of payment is received.
Refused
Refusal letter issued by the "Controller" outlining reasons.

September 2021

Accepted
Application meeting all required documentation is logged on the system.
Granted
Application evaluated and approval letter generated.
Issued
Licence certificate issued after payment confirmation.
Refused
Refusal notice issued outlining reasons.

August 2021

Accepted
Application meeting required documentation logged on system.
Granted
Approval letter generated requesting payment.
Issued
Licence certificate issued upon proof of payment.
Refused
Refusal letter issued outlining reasons.

July 2021

Accepted
An application that meets the basic requirements (with all necessary documents) is logged on the system.
Granted
Application evaluated and signed by the "Controller". Approval letter generated requesting payment.
Issued
Licence certificate issued after proof of payment is received.
Refused
Refusal letter issued stating reasons for refusal.

June 2021

Accepted
Application meeting required documentation logged on the system.
Granted
Approval letter generated and signed by the "Controller".
Issued
Licence certificate issued upon payment confirmation.
Refused
Refusal notice issued outlining reasons.

May 2021

Accepted
Application logged on system after meeting documentation requirements.
Granted
Application evaluated and approval letter generated.
Issued
Licence certificate issued after payment confirmation.
Refused
Refusal letter issued stating reasons.

April 2021

Accepted
Application meeting documentation requirements logged on system.
Granted
Approval letter generated by the system.
Issued
Licence certificate issued after payment.
Refused
Refusal notice issued outlining reasons.

March 2021

Accepted
An application that meets the basic requirements (as stipulated in the application form / with all the necessary documents) is logged on the system.
Granted
An application that has been evaluated by an Analyst and a recommendation made, signed by the "Controller". An approval letter is generated by the system requesting payment of licence fees.
Issued
A licence certificate is issued to the applicant after receiving proof of payment (NEDBANK deposit slip with correct reference number as indicated on the approval letter).
Refused
A refusal letter, signed by the "Controller", is issued to the applicant stating the reasons for refusal of the licence application.

February 2021

Accepted
An application that meets the basic requirements (as stipulated in the application form / with all the necessary documents) is logged on the system.
Granted
An application that has been evaluated by an Analyst and a recommendation made, signed by the "Controller". An approval letter is generated by the system requesting payment of licence fees.
Issued
A licence certificate is issued to the applicant after receiving proof of payment (NEDBANK deposit slip with correct reference number as indicated on the approval letter).
Refused
A refusal letter, signed by the "Controller", is issued to the applicant stating the reasons for refusal of the licence application.

January 2021

Accepted
Application meeting required documentation logged on system.
Granted
Approval letter generated and signed by the "Controller".
Issued
Licence certificate issued upon payment confirmation.
Refused
Refusal letter issued stating reasons for refusal.

December 2024

Accepted
An application that meets the basic requirements (as stipulated in the application form / with all the necessary documents) is logged on the system.
Granted
An application that has been evaluated by an Analyst and a recommendation made, signed by the "Controller". An approval letter is generated requesting payment of licence fees.
Issued
Licence certificate issued after receiving proof of payment (NEDBANK deposit slip with correct reference).
Refused
Refusal letter issued by the "Controller" stating reasons for refusal.

November 2024

Accepted
Application meeting all required documentation is logged on the system.
Granted
Application evaluated and approval letter generated.
Issued
Licence certificate issued after payment confirmation.
Refused
Refusal notice issued outlining reasons.

October 2024

Accepted
An application that meets the basic requirements (as stipulated in the application form / with all the necessary documents) is logged on the system.
Granted
Application evaluated by Analyst and signed by the "Controller". Approval letter generated requesting payment.
Issued
Licence certificate issued after proof of payment is received.
Refused
Refusal letter issued by the "Controller" outlining reasons.

September 2024

Accepted
Application meeting all required documentation is logged on the system.
Granted
Application evaluated and approval letter generated.
Issued
Licence certificate issued after payment confirmation.
Refused
Refusal notice issued outlining reasons.

August 2024

Accepted
Application meeting required documentation logged on system.
Granted
Approval letter generated requesting payment.
Issued
Licence certificate issued upon proof of payment.
Refused
Refusal letter issued outlining reasons.

July 2024

Accepted
An application that meets the basic requirements (with all necessary documents) is logged on the system.
Granted
Application evaluated and signed by the "Controller". Approval letter generated requesting payment.
Issued
Licence certificate issued after proof of payment is received.
Refused
Refusal letter issued stating reasons for refusal.

June 2024

Accepted
Application meeting required documentation logged on the system.
Granted
Approval letter generated and signed by the "Controller".
Issued
Licence certificate issued upon payment confirmation.
Refused
Refusal notice issued outlining reasons.

May 2024

Accepted
Application logged on system after meeting documentation requirements.
Granted
Application evaluated and approval letter generated.
Issued
Licence certificate issued after payment confirmation.
Refused
Refusal letter issued stating reasons.

April 2024

Accepted
Application meeting documentation requirements logged on system.
Granted
Approval letter generated by the system.
Issued
Licence certificate issued after payment.
Refused
Refusal notice issued outlining reasons.

March 2024

Accepted
An application that meets the basic requirements (as stipulated in the application form / with all the necessary documents) is logged on the system.
Granted
An application that has been evaluated by an Analyst and a recommendation made, signed by the "Controller". An approval letter is generated by the system requesting payment of licence fees.
Issued
A licence certificate is issued to the applicant after receiving proof of payment (NEDBANK deposit slip with correct reference number as indicated on the approval letter).
Refused
A refusal letter, signed by the "Controller", is issued to the applicant stating the reasons for refusal of the licence application.

February 2024

Accepted
An application that meets the basic requirements (as stipulated in the application form / with all the necessary documents) is logged on the system.
Granted
An application that has been evaluated by an Analyst and a recommendation made, signed by the "Controller". An approval letter is generated by the system requesting payment of licence fees.
Issued
A licence certificate is issued to the applicant after receiving proof of payment (NEDBANK deposit slip with correct reference number as indicated on the approval letter).
Refused
A refusal letter, signed by the "Controller", is issued to the applicant stating the reasons for refusal of the licence application.

January 2024

Accepted
Application meeting required documentation logged on system.
Granted
Approval letter generated and signed by the "Controller".
Issued
Licence certificate issued upon payment confirmation.
Refused
Refusal letter issued stating reasons for refusal.

December 2020

Accepted
An application that meets the basic requirements (as stipulated in the application form / with all the necessary documents) is logged on the system.
Granted
An application that has been evaluated by an Analyst and a recommendation made, signed by the "Controller". An approval letter is generated requesting payment of licence fees.
Issued
Licence certificate issued after receiving proof of payment (NEDBANK deposit slip with correct reference).
Refused
Refusal letter issued by the "Controller" stating reasons for refusal.

November 2020

Accepted
Application meeting all required documentation is logged on the system.
Granted
Application evaluated and approval letter generated.
Issued
Licence certificate issued after payment confirmation.
Refused
Refusal notice issued outlining reasons.

October 2020

Accepted
An application that meets the basic requirements (as stipulated in the application form / with all the necessary documents) is logged on the system.
Granted
Application evaluated by Analyst and signed by the "Controller". Approval letter generated requesting payment.
Issued
Licence certificate issued after proof of payment is received.
Refused
Refusal letter issued by the "Controller" outlining reasons.

September 2020

Accepted
Application meeting all required documentation is logged on the system.
Granted
Application evaluated and approval letter generated.
Issued
Licence certificate issued after payment confirmation.
Refused
Refusal notice issued outlining reasons.

August 2020

Accepted
Application meeting required documentation logged on system.
Granted
Approval letter generated requesting payment.
Issued
Licence certificate issued upon proof of payment.
Refused
Refusal letter issued outlining reasons.

July 2020

Accepted
An application that meets the basic requirements (with all necessary documents) is logged on the system.
Granted
Application evaluated and signed by the "Controller". Approval letter generated requesting payment.
Issued
Licence certificate issued after proof of payment is received.
Refused
Refusal letter issued stating reasons for refusal.

June 2020

Accepted
Application meeting required documentation logged on the system.
Granted
Approval letter generated and signed by the "Controller".
Issued
Licence certificate issued upon payment confirmation.
Refused
Refusal notice issued outlining reasons.

May 2020

Accepted
Application logged on system after meeting documentation requirements.
Granted
Application evaluated and approval letter generated.
Issued
Licence certificate issued after payment confirmation.
Refused
Refusal letter issued stating reasons.

April 2020

Accepted
Application meeting documentation requirements logged on system.
Granted
Approval letter generated by the system.
Issued
Licence certificate issued after payment.
Refused
Refusal notice issued outlining reasons.

March 2020

Accepted
An application that meets the basic requirements (as stipulated in the application form / with all the necessary documents) is logged on the system.
Granted
An application that has been evaluated by an Analyst and a recommendation made, signed by the "Controller". An approval letter is generated by the system requesting payment of licence fees.
Issued
A licence certificate is issued to the applicant after receiving proof of payment (NEDBANK deposit slip with correct reference number as indicated on the approval letter).
Refused
A refusal letter, signed by the "Controller", is issued to the applicant stating the reasons for refusal of the licence application.

February 2020

Accepted
An application that meets the basic requirements (as stipulated in the application form / with all the necessary documents) is logged on the system.
Granted
An application that has been evaluated by an Analyst and a recommendation made, signed by the "Controller". An approval letter is generated by the system requesting payment of licence fees.
Issued
A licence certificate is issued to the applicant after receiving proof of payment (NEDBANK deposit slip with correct reference number as indicated on the approval letter).
Refused
A refusal letter, signed by the "Controller", is issued to the applicant stating the reasons for refusal of the licence application.

January 2020

Accepted
Application meeting required documentation logged on system.
Granted
Approval letter generated and signed by the "Controller".
Issued
Licence certificate issued upon payment confirmation.
Refused
Refusal letter issued stating reasons for refusal.

December 2024

Accepted
An application that meets the basic requirements (as stipulated in the application form / with all the necessary documents) is logged on the system.
Granted
An application that has been evaluated by an Analyst and a recommendation made, signed by the "Controller". An approval letter is generated requesting payment of licence fees.
Issued
Licence certificate issued after receiving proof of payment (NEDBANK deposit slip with correct reference).
Refused
Refusal letter issued by the "Controller" stating reasons for refusal.

November 2024

Accepted
Application meeting all required documentation is logged on the system.
Granted
Application evaluated and approval letter generated.
Issued
Licence certificate issued after payment confirmation.
Refused
Refusal notice issued outlining reasons.

October 2024

Accepted
An application that meets the basic requirements (as stipulated in the application form / with all the necessary documents) is logged on the system.
Granted
Application evaluated by Analyst and signed by the "Controller". Approval letter generated requesting payment.
Issued
Licence certificate issued after proof of payment is received.
Refused
Refusal letter issued by the "Controller" outlining reasons.

September 2024

Accepted
Application meeting all required documentation is logged on the system.
Granted
Application evaluated and approval letter generated.
Issued
Licence certificate issued after payment confirmation.
Refused
Refusal notice issued outlining reasons.

August 2024

Accepted
Application meeting required documentation logged on system.
Granted
Approval letter generated requesting payment.
Issued
Licence certificate issued upon proof of payment.
Refused
Refusal letter issued outlining reasons.

July 2024

Accepted
An application that meets the basic requirements (with all necessary documents) is logged on the system.
Granted
Application evaluated and signed by the "Controller". Approval letter generated requesting payment.
Issued
Licence certificate issued after proof of payment is received.
Refused
Refusal letter issued stating reasons for refusal.

June 2024

Accepted
Application meeting required documentation logged on the system.
Granted
Approval letter generated and signed by the "Controller".
Issued
Licence certificate issued upon payment confirmation.
Refused
Refusal notice issued outlining reasons.

May 2024

Accepted
Application logged on system after meeting documentation requirements.
Granted
Application evaluated and approval letter generated.
Issued
Licence certificate issued after payment confirmation.
Refused
Refusal letter issued stating reasons.

April 2024

Accepted
Application meeting documentation requirements logged on system.
Granted
Approval letter generated by the system.
Issued
Licence certificate issued after payment.
Refused
Refusal notice issued outlining reasons.

March 2024

Accepted
An application that meets the basic requirements (as stipulated in the application form / with all the necessary documents) is logged on the system.
Granted
An application that has been evaluated by an Analyst and a recommendation made, signed by the "Controller". An approval letter is generated by the system requesting payment of licence fees.
Issued
A licence certificate is issued to the applicant after receiving proof of payment (NEDBANK deposit slip with correct reference number as indicated on the approval letter).
Refused
A refusal letter, signed by the "Controller", is issued to the applicant stating the reasons for refusal of the licence application.

February 2024

Accepted
An application that meets the basic requirements (as stipulated in the application form / with all the necessary documents) is logged on the system.
Granted
An application that has been evaluated by an Analyst and a recommendation made, signed by the "Controller". An approval letter is generated by the system requesting payment of licence fees.
Issued
A licence certificate is issued to the applicant after receiving proof of payment (NEDBANK deposit slip with correct reference number as indicated on the approval letter).
Refused
A refusal letter, signed by the "Controller", is issued to the applicant stating the reasons for refusal of the licence application.

January 2024

Accepted
Application meeting required documentation logged on system.
Granted
Approval letter generated and signed by the "Controller".
Issued
Licence certificate issued upon payment confirmation.
Refused
Refusal letter issued stating reasons for refusal.

December 2019

Accepted
An application that meets the basic requirements (as stipulated in the application form / with all the necessary documents) is logged on the system.
Granted
An application that has been evaluated by an Analyst and a recommendation made, signed by the "Controller". An approval letter is generated requesting payment of licence fees.
Issued
Licence certificate issued after receiving proof of payment (NEDBANK deposit slip with correct reference).
Refused
Refusal letter issued by the "Controller" stating reasons for refusal.

November 2019

Accepted
Application meeting all required documentation is logged on the system.
Granted
Application evaluated and approval letter generated.
Issued
Licence certificate issued after payment confirmation.
Refused
Refusal notice issued outlining reasons.

October 2019

Accepted
An application that meets the basic requirements (as stipulated in the application form / with all the necessary documents) is logged on the system.
Granted
Application evaluated by Analyst and signed by the "Controller". Approval letter generated requesting payment.
Issued
Licence certificate issued after proof of payment is received.
Refused
Refusal letter issued by the "Controller" outlining reasons.

September 2019

Accepted
Application meeting all required documentation is logged on the system.
Granted
Application evaluated and approval letter generated.
Issued
Licence certificate issued after payment confirmation.
Refused
Refusal notice issued outlining reasons.

August 2019

Accepted
Application meeting required documentation logged on system.
Granted
Approval letter generated requesting payment.
Issued
Licence certificate issued upon proof of payment.
Refused
Refusal letter issued outlining reasons.

July 2019

Accepted
An application that meets the basic requirements (with all necessary documents) is logged on the system.
Granted
Application evaluated and signed by the "Controller". Approval letter generated requesting payment.
Issued
Licence certificate issued after proof of payment is received.
Refused
Refusal letter issued stating reasons for refusal.

June 2019

Accepted
Application meeting required documentation logged on the system.
Granted
Approval letter generated and signed by the "Controller".
Issued
Licence certificate issued upon payment confirmation.
Refused
Refusal notice issued outlining reasons.

May 2019

Accepted
Application logged on system after meeting documentation requirements.
Granted
Application evaluated and approval letter generated.
Issued
Licence certificate issued after payment confirmation.
Refused
Refusal letter issued stating reasons.

April 2019

Accepted
Application meeting documentation requirements logged on system.
Granted
Approval letter generated by the system.
Issued
Licence certificate issued after payment.
Refused
Refusal notice issued outlining reasons.

March 2019

Accepted
An application that meets the basic requirements (as stipulated in the application form / with all the necessary documents) is logged on the system.
Granted
An application that has been evaluated by an Analyst and a recommendation made, signed by the "Controller". An approval letter is generated by the system requesting payment of licence fees.
Issued
A licence certificate is issued to the applicant after receiving proof of payment (NEDBANK deposit slip with correct reference number as indicated on the approval letter).
Refused
A refusal letter, signed by the "Controller", is issued to the applicant stating the reasons for refusal of the licence application.

February 2019

Accepted
An application that meets the basic requirements (as stipulated in the application form / with all the necessary documents) is logged on the system.
Granted
An application that has been evaluated by an Analyst and a recommendation made, signed by the "Controller". An approval letter is generated by the system requesting payment of licence fees.
Issued
A licence certificate is issued to the applicant after receiving proof of payment (NEDBANK deposit slip with correct reference number as indicated on the approval letter).
Refused
A refusal letter, signed by the "Controller", is issued to the applicant stating the reasons for refusal of the licence application.

January 2019

Accepted
Application meeting required documentation logged on system.
Granted
Approval letter generated and signed by the "Controller".
Issued
Licence certificate issued upon payment confirmation.
Refused
Refusal letter issued stating reasons for refusal.