| PDD
Title |
Project
Description |
|
Grid Connected Wind Power Plant in Witberg, South Africa
Application Form
|
G7 Renewable Energies (Pty) Ltd submitted a request for approval for the project Grid Connected Wind Power Plant in Witberg, South Africa, herein referred to as the project, as a Clean Development Mechanism project and issue of a Letter of Approval to support the project.
The proposed project involves the installation of wind power plant which will produce electricity. It will have electricity generation capacity of 150MW and will be supplied onto the South African national electricity grid to displace the generation from traditional coal-based electricity.
The proposed project activity will reduce greenhouse gas emissions by 527 492.12 (tCO2e) per annum, over a crediting period of 7 years.
|
| Location |
Republic of South Africa |
| Status |
Not
Registered |
| Period |
09 Nov 2011 – 09 Dec 2011 |
| Send comments to DNA |
DNA@energy.gov.za
ndiafhi.tuwani@energy.gov.za or lufuno.mukwevho@energy.gov.za |
| PDD
Title |
Project
Description |
|
Grid Connected Wind Power Plant in Klawer, South Africa
Application Form
|
The proposed project involves the installation of wind power plant which will produce electricity. It will have electricity generation capacity of 30MW and will be supplied onto the South African national electricity grid to displace the generation from traditional coal-based electricity.
The proposed project activity will reduce greenhouse gas emissions by 81 451.76 (tCO2e) per annum, over a crediting period of 21 years.
|
| Location |
Republic of South Africa |
| Status |
Not
Registered |
| Period |
18 Oct 2011 – 17 Nov 2011 |
| Send comments to DNA |
DNA@energy.gov.za
ndiafhi.tuwani@energy.gov.za or lufuno.mukwevho@energy.gov.za |
| PDD
Title |
Project
Description |
|
IFM Integrated Clean Energy Project.
Application Form IFM
|
The project involves the utilisation of waste furnace off-gas as a source of energy to generate clean electricity and contribute to lower greenhouse gas by replacing fossil fuel based power from the national grid. |
| Location |
Republic of South Africa |
| Status |
Not
Registered |
| Period |
27 September 2011 – 27 October 2011 |
| Send comments to DNA |
DNA@energy.gov.za
ndiafhi.tuwani@energy.gov.za or lufuno.mukwevho@energy.gov.za |
| PDD
Title |
Project
Description |
|
Joburg Landfill Gas to Energy Project
|
The objective of the proposed project is development of landfill gas extraction and utilization systems at five landfill sites (Linbro Park, Marie Louise, Robinson Deep, Goudkoppies and Ennerdale Landfill sites) within the Joburg municipality. It entails the installation of a gas extraction wells and a gas collection system to collect and extract landfill gas from the five landfill sites. The gas will be flared and then be used to generate electricity that will be supplied to local electricity distribution system.
The proposed project activity will reduce greenhouse gas emissions by 530 083 (tCO2e) per annum, over a crediting period of 21 years. |
| Location |
Republic of South Africa |
| Status |
Not
Registered |
| Period |
13 Sept 2011 – 12 Oct 2011 |
| Send comments to DNA |
DNA@energy.gov.za
ndiafhi.tuwani@energy.gov.za or lufuno.mukwevho@energy.gov.za |
| PDD
Title |
Project
Description |
| Fuel Switch at Corobrik’s Driefontein Brick Factory in South Africa. Document 1
Fuel Switch at Corobrik’s Driefontein Brick Factory in South Africa. Document 2
|
The project involves the conversion from coal to natural gas in the clay brick-firing tunnel kiln at Driefontein Brick Factory.
The project will reduce greenhouse gas emissions as natural gas is less Greenhouse Gas (GHG) emission intensive than coal. It will also results in a minor improvement in energy efficiency. |
| Location |
Republic of South Africa |
| Status |
Not
Registered |
| Period |
11 August 2011 – 11 September 2011 |
| Send comments to DNA |
DNA@energy.gov.za
ndiafhi.tuwani@energy.gov.za or lufuno.mukwevho@energy.gov.za |
| |
| PDD
Title |
Project
Description |
| Springbok Grid Connected 55.5 MW Wind Farm, South Africa
Springbok Grid Connected 55,5 MW Wind Farm Project
|
The proposed project envisages the construction and operation of a wind farm with installed capacity of up to 55.5 MW. The wind farm will be comprised of up to 37 wind turbine generators and the associated infrastructure. Produced electricity will be supplied to the Eskom electricity network.
The wind turbines capture the kinetic energy of the wind to drive a generator located within the wind turbine where this energy is subsequently converted into electricity.The proposed project activity will reduce greenhouse gas emissions by 128 733 (tCO2e) per annum, over a crediting period of 10 years. |
| Location |
Republic of South Africa |
| Status |
Not
Registered |
| Period |
18 Nov 2011 – 17 Dec 2011 |
| Send comments to DNA |
DNA@energy.gov.za
ndiafhi.tuwani@energy.gov.za or lufuno.mukwevho@energy.gov.za |
| |
| PDD
Title |
Project
Description |
| Body Coal and Clamp Kiln Fuel Switch at Allbrick, South Africa
2011-10-21-Allbrick PDD
|
The proposed project objective is to reduce greenhouse gas emissions by implementing a fuel switch from coal (fossil fuel) to charcoal (renewable fuel) in the clamp kilns and as the body fuel in the bricks. The charcoal is produced using wood waste from the local sawmills.
The proposed project activity will reduce greenhouse gas emissions by 5 604 (tCO2e) per annum, over a crediting period of 10 years. |
| Location |
Republic of South Africa |
| Status |
Not
Registered |
| Period |
18 Nov 2011 – 17 Dec 2011 |
| Send comments to DNA |
DNA@energy.gov.za
ndiafhi.tuwani@energy.gov.za or lufuno.mukwevho@energy.gov.za |
| |
| PDD
Title |
Project
Description |
| Renewable energy generation through anaerobic digestion and biogas-based generation in South Africa
PDD_Application_Form- Farmsecure - AD PoA
CDM-PoA-DD Farmsecure - AD - 22 August 2011
|
The proposed Programme of Activities (PoA) will involve renewable energy generation through anaerobic digestion and biogas based energy generation. Some CDM Project Activities (CPAs) will also involve methane recovery from biomass that would have been left to decay anaerobically.
The first CPA will reduce greenhouse gas emissions by 4 909 (tCO2e) per annum, over a crediting period of 7 years. |
| Location |
Republic of South Africa |
| Status |
Not
Registered |
| Period |
18 Nov 2011 – 17 Dec 2011 |
| Send comments to DNA |
DNA@energy.gov.za
ndiafhi.tuwani@energy.gov.za or lufuno.mukwevho@energy.gov.za |
| PDD
Title |
Project
Description |
| De Aar Grid Connected 100.5 MW Wind Farm, South Africa
PDD Application Form_De Aar_18 11 2011 to the DNA
|
The proposed project envisages the construction and operation of a wind farm with installed capacity of up to 100.5 MW. The wind farm will be comprised of up to 67 wind turbine generators, and the associated infrastructure.
Produced electricity will be supplied to the Eskom electricity network.The wind turbines capture the kinetic energy of the wind to drive a generator located within the wind turbine where this energy is subsequently converted into electricity.
The proposed project activity will reduce greenhouse gas emissions by 227 892 (tCO2e) per annum, over a crediting period of 10 years. |
| Location |
Republic of South Africa |
| Status |
Not
Registered |
| Period |
18 Nov 2011 – 17 Dec 2011 |
| Send comments to DNA |
DNA@energy.gov.za
ndiafhi.tuwani@energy.gov.za or lufuno.mukwevho@energy.gov.za |